Tuesday, October 1, 2019

Coyote Assembly Part 2

I had the heads rebuilt by a local guy with lots of head rebuilding experience. He knew what to do with the head. I installed Manley stainless valves, Boss 302 springs, and other new hardware as needed. The heads were surfaced at the same time by a very small amount.









Head bolts were torqued and turned to the required angle using factory replacement TTY head bolts in the proper sequence.


Completed head and block assembly


(All work shown in this post was done in 2018)


No comments: